WFP × 4BlueTech PoC | 5 / 10 Pathways Live
← Hub
WFP
World Food Programme
4BlueTech
Pathway #05 Get in Touch
← Back to All Pathways
Pathway #05 · Assessment Phase

Circular Economy
for Vehicles & Parts

A 3-phase circularity programme for WFP's 5,800-vehicle fleet — refurbishment networks, parts re-use loops, and end-of-life vehicle processing cutting fleet waste cost by 30% and landfill material by 70%.

WFP Fleet Circular Economy Loop
Every vehicle and component enters a managed lifecycle — nothing leaves the network without maximising its reuse, refurbishment, or material recovery value.
PHASE 1
Active Fleet
Telematics-tracked age & condition scoring
PHASE 2
Condition Triage
NarrioOs flags refurb vs retire decision
PHASE 3
Refurbishment
Regional depots restore to service-grade
PHASE 4
Parts Harvest
Usable parts catalogued into shared parts pool
PHASE 5
Material Recovery
Certified recycler extracts metals, fluids, rubber
NarrioOs · Fleet Circularity Tracker · 5,800 Vehicles
Fleet Status
Parts Pool
Depot Network
Waste Diversion
Cost Savings
5,800
Total Fleet Vehicles
42 countries · 6 regions
70%
Target Landfill Diversion
vs. 12% current baseline
€4.2M
Annual Parts Savings (projected)
via shared parts pool
Engines & Drivetrains
High-value · Remanufacture candidate
Avg remaining life34%
Annual units retired312
Reuse potential68%
Tyres & Wheels
Volume · Retreading programme
Avg wear remaining41%
Annual units replaced18,400
Retread eligible55%
Batteries & Electrical
Growing EV transition · second-life
Battery capacity retention72%
Second-life eligible81%
Energy storage reuseDepot UPS
Lubricants & Fluids
Hazardous · Certified re-refining
Current landfill rate64%
Re-refining potential90%
Volume / year340,000L
Regional Refurbishment & Parts Depot Network
8 regional circular depots aligned with WFP's major logistics hubs — enabling local parts reuse instead of costly cross-border shipments.
Nairobi HUB
Dakar
Amman
Islamabad
Kampala
Addis Ababa
Kinshasa
Bangkok
Primary Hub (full refurb)
Secondary (parts pool)
Collection point
Planned (Year 2)
End-of-Life Vehicle Decision Framework
NarrioOs scores each retired vehicle across 5 dimensions and routes it to the optimal circular pathway.
Vehicle Type Age Range Avg Condition Score Primary Pathway Parts Yield Value CO₂e Saved vs New
Light 4WD (Toyota HiLux-class) 8–12 yrs62 / 100 Refurbish → Re-deploy €8,400 / unit −6.2t CO₂e vs new buy
Medium Truck (3.5–7.5t) 10–15 yrs49 / 100 Parts Harvest → Recycle €14,200 / unit −3.8t CO₂e vs new buy
Heavy Truck (>7.5t) 12–18 yrs38 / 100 Full Parts Harvest €22,600 / unit −9.1t CO₂e vs new buy
Ambulance / Specialist 6–10 yrs71 / 100 Priority Refurbish €11,800 / unit −8.7t CO₂e vs new buy
Generator Vehicles 15–20 yrs29 / 100 Battery Second-Life €6,300 / unit −4.4t CO₂e vs new buy
3-Phase Circularity Rollout — 18 Months
Month 1–4
Fleet Census & Condition Baseline
NarrioOs telematics sweep of entire 5,800-vehicle fleet. Age, mileage, maintenance records, and condition scoring ingested. End-of-life queue identified — approximately 840 vehicles flagged for circular processing in Year 1.
NarrioOs5,800 vehiclesCondition scoring
Month 5–10
Primary Hub Activation (Nairobi + Dakar)
First 2 full-capability circular depots operational. Refurbishment bays, parts cataloguing system, certified fluid recovery, and recycler partnerships established. First 200 vehicles processed through circularity pathway.
Nairobi HubDakar Hub200 vehicles4BT Assess
Month 11–18
Full Network + Zero Hazardous Waste Certification
6 additional depots online across Amman, Islamabad, Bangkok, Kampala, Addis Ababa. Fleet-wide zero hazardous waste certification submitted. Shared parts pool open to all WFP regions — €4.2M annual procurement savings realised.
8 depotsZero hazardous wasteParts pool€4.2M saved
4BT Products Powering This Pathway
AE
4BT Assess
Vehicle condition assessment module. Combines telematics history, maintenance records, and physical inspection checklists to produce a 0–100 circularity score per vehicle.
RM
4BT RoadMap
Tracks the fleet's circular transition trajectory — depot network buildout, parts pool growth, waste diversion rates — against 18-month milestones with automated alerts.
PR
4BT Procure
When circular parts are available in the shared pool, Procure diverts procurement orders from new-buy to pool inventory first — saving cost and avoiding new manufacturing emissions.
18-Month Circular Economy Outcomes
70%
Landfill-bound material diverted (vs 12% baseline)
€4.2M
Annual parts procurement savings via shared pool
11,200t
CO₂e avoided via refurb vs new vehicle manufacturing
840
Vehicles processed through circular pathway in Year 1
−30%
Fleet waste cost reduction across all WFP operations
0
Hazardous waste to landfill — target by Month 18