WFP × 4BlueTech PoC | 7 / 10 Pathways Live
← Hub
WFP
World Food Programme
4BlueTech
Pathway #07 Get in Touch
← Back to All Pathways
Pathway #07 · Pilot Ready

Waste Management
Frameworks

An 18-month pathway to zero hazardous waste certification across all WFP operational depots — covering lubricants, fluids, batteries, and fleet consumables through certified recycling networks.

Fleet Waste Register & Compliance Tracker
Every waste stream from every maintenance event registered, linked to a certified disposal partner, and tracked against zero-hazardous-waste certification milestones.
NarrioOs · Fleet Waste Register · WFP Depots Global
Waste Register
Hazardous Streams
Depot Status
Compliance
Recycler Network
64%
Hazardous Waste Currently to Landfill
Target: 0% by Month 18
1,240t
Annual Hazardous Waste Volume
Across 38 depots globally
€1.8M
Compliance Risk Avoided (projected)
Fines + remediation potential
Used Motor Oil & Lubricants
340,000 L / year · HAZARDOUS
Current landfill rate64%
Re-refining potential90%
Certified partners available12 regions
Batteries (Lead-Acid & Li-Ion)
4,800 units / year · HAZARDOUS
Current landfill rate42%
Recycling recovery rate95%
Lead content per unit11.4 kg avg
Brake Fluid & Coolant
89,000 L / year · HAZARDOUS
Current disposal methodInformal (78%)
Distillation recovery85%
Compliance risk levelHIGH
Tyres (End-of-Life)
18,400 units / year · NON-HAZARDOUS
Current landfill rate31%
Retread / granulate69%
Energy recovery optionCement kiln
Depot Compliance Status — Priority Ranking
38 WFP depots ranked by waste compliance risk. Red = immediate action required; Amber = improvement plan needed; Green = pathway to certification.
DepotCountryVehicles MaintainedHazardous Waste VolCurrent DisposalCompliance StatusPriority
Nairobi CentralKenya22094,000 LMixed — 55% landfillNeeds PlanP1
Juba SouthSouth Sudan18478,000 LInformal — 82% landfillCriticalP1
Islamabad HubPakistan16371,000 LPartial — 48% landfillNeeds PlanP2
Kinshasa DepotDRC14862,000 LInformal — 91% landfillCriticalP1
Dakar WestSenegal12754,000 LMixed — 61% landfillNeeds PlanP2
Amman RegionalJordan11247,000 LCertified — 18% landfillOn TrackP3
Bangkok SEAPThailand9841,000 LCertified — 12% landfillOn TrackP3
Certified Disposal Method per Stream
Used Motor Oil
340,000 L / yr
Re-refining → base oil
ISO 14001 · API SN certification
Lead-Acid Batteries
3,800 units / yr
Smelting → 95% lead recovery
Basel Convention compliant
Li-Ion Batteries
1,000 units / yr
Hydromet → Li/Co/Ni recovery
EU Battery Regulation aligned
Brake & Coolant Fluid
89,000 L / yr
Distillation → reuse grade
REACH regulation compliant
End-of-Life Tyres
18,400 units / yr
Granulation → TDF energy
ISO 14001 · ELT directive
Refrigerants (R134a)
2,400 kg / yr
Recovery & reclaim unit
Montreal Protocol F-gas
Zero Hazardous Waste — 18-Month Certification Path
Month 1–2
Waste Quantification Sprint
2-week structured audit across priority P1 depots. Volume, type, and current disposal method for every waste stream captured. NarrioOs waste register seeded. First compliance risk score generated per depot.
P1 depotsWaste registerNarrioOs
Month 3–6
Recycler Network Establishment
Certified recycling partners contracted for each hazardous stream in each region. Collection schedules set. Waste tracking chain of custody activated in NarrioOs — every litre and unit tracked from depot to disposal facility.
Partner contractsChain of custodyAll streams
Month 7–12
Full Depot Coverage + ISO 14001 Prep
All 38 depots in waste register. Landfill diversion rate >90% across hazardous streams. ISO 14001 gap assessment completed. Documentation package prepared for audit body submission.
All 38 depotsISO 14001 gap>90% diversion
Month 13–18
Zero Hazardous Waste Certification
External audit body verifies 100% certified disposal for all hazardous streams. Zero-hazardous-waste declaration submitted. NarrioOs generates ongoing compliance reports for donors, regulators, and WFP sustainability office.
CertificationDonor reports100% documented
4BT Products Powering This Pathway
AE
4BT Assess
Fleet waste audit module. Structured questionnaire for depot waste quantification. Outputs a per-stream volume estimate and compliance risk rating for each depot within 2 weeks of data collection.
RM
4BT RoadMap
Tracks the 18-month certification pathway — recycler network buildout, landfill diversion rate trajectory, ISO 14001 readiness milestones, and depot compliance status in a single dashboard view.
PR
4BT Procure
Waste disposal procurement module. Manages certified recycler contracts, collection schedules, and invoice verification. Ensures only compliant partners are used for hazardous stream disposal.
18-Month Waste Management Outcomes
0
Hazardous waste to landfill — target by Month 18
€1.8M
Compliance risk exposure avoided (fines + remediation)
1,240t
Annual hazardous waste redirected to certified recycling
38
Depots in certified waste management programme
ISO
14001-aligned certification for WFP fleet operations
100%
Waste streams tracked with full chain-of-custody records